Bidding: Lead-Deadwood Waste Water Treatment Facility Pump Replacement

Bid Date: November 28th, 2017
Bid Time: 10:00 AM
Owner: Lead-Deadwood Sanitary District No.1, SD
Engineer: HDR Engineering

Plans and specs can be obtained from HDR Engineering at 703 Main Street, Suite 200, Rapid City, SD 57701, Attn: Chris Robinson. Please check our website periodically for any future Addenda, should there be any for this project.