Bismarck Water Treatment Facility – Phase III Improvements

Project Number: 0221

Final Contract: $1,200,000

Actual Completion: 2002
Owner: City of Bismarck, North Dakota

Engineer: AE2S

Project Details
  • 30 MGD Rated Capacity … 9.35 MGD Average Daily Production
  • Expansion of New Control Room Over Pipe Gallery
    • New Structural Steel Elevated Floor Framing
    • New Concrete Floor Over Structural Steel Framing
  • Renovation of Operations Area
    • New Aluminum Windows & Walk Doors
    • New Overhead Coiling Service Doors
    • New Emergency Exist
    • New Catwalk Platforms and Handrail Systems
    • FRP Wall Covering in Filter Areas
  • Convert Existing Conference Room Into New Laboratory
    • New Lab Casework, Fixtures & Equipment
    • New HVAC & Plumbing Systems
  • Insulation System @ All Gallery Level Process Piping
    • Pipe Ranged in Size From 1-inch up to 60-Inch
    • Insulation System Consisted of Armaflex Insulation w/PVC Color Coded Jacket
  • High Performance Coatings