Fargo Ground Storage Reservoir & Pump Station

Project Number: 1007

Final Contract: $13,800,000

Actual Completion: 2012
Owner: City of Fargo, North Dakota


Engineer: AE2S

Project Details
  • Pump Station
    • Construction of a New Remote High Service Pump Station
    • Deep Foundation System Consisting of 4,000lf of HP12x63
    • Two (2) High Capacity 300HP Canned Vertical Turbine Pumps Capable of 7,000 GPM and Two (2) Low Capacity 125HP Canned Vertical Turbine Pumps Capable of 4,000 GPM
    • Process Piping, Valves, and Fittings Ranging in Size From 4” to 54”
    • Chlorine & Ammonia Feed Systems
  • Ground Storage Reservoir
    • Construction of a 5.5 Million Gallon Pre-Stressed Wire-Wound Concrete Storage Tank
    • Deep Foundation System Consisting of 30,000lf of HP12x63
    • Floating Solar Powered Circulation System
  • Site Improvements
    • Site Piping Ranging in Size From 36” to 54”
    • Site Grading, Sidewalks, Curb & Gutter, Concrete & Gravel Drives, Fencing and Final Site Restoration