Fargo Ground Storage Reservoir & Pump Station
Final Contract: $13,800,000
Actual Completion: 2012
Engineer: AE2S
- Pump Station
- Construction of a New Remote High Service Pump Station
- Deep Foundation System Consisting of 4,000lf of HP12x63
- Two (2) High Capacity 300HP Canned Vertical Turbine Pumps Capable of 7,000 GPM and Two (2) Low Capacity 125HP Canned Vertical Turbine Pumps Capable of 4,000 GPM
- Process Piping, Valves, and Fittings Ranging in Size From 4” to 54”
- Chlorine & Ammonia Feed Systems
- Ground Storage Reservoir
- Construction of a 5.5 Million Gallon Pre-Stressed Wire-Wound Concrete Storage Tank
- Deep Foundation System Consisting of 30,000lf of HP12x63
- Floating Solar Powered Circulation System
- Site Improvements
- Site Piping Ranging in Size From 36” to 54”
- Site Grading, Sidewalks, Curb & Gutter, Concrete & Gravel Drives, Fencing and Final Site Restoration