Project Spotlight
At PKG Contracting, we are proud of our extensive experience in the water and wastewater industry.
Selby, South Dakota
WEB Water Treatment Plant Improvements
The WEB Water Treatment Plant Improvements project, which started in April of 2022 included construction of a new 1.5 MG raw water regulating tank, expansion of the existing treatment facilities to approximately 17-MGD by adding two additional filters sized at 6 MGD, rehabilitation of the existing filters from 1984 and 1987 including new underdrains, media, and an air scour system. Also included as part of this project are a new 500,000-gallon Clearwell, replacing two high service pumps, adding a fifth new high service pump and a new 150,000-gallon washwater recover basin. Throughout the project PKG completed multiple plant shutdowns and critical tie-ins to existing service. PKG completed the project with less than 1% in contract changes, allowing the owner the opportunity to add back in alternates scopes of work that were not originally accepted as part of the original contract.
Location: Selby, South Dakota
Project Owner: WEB Water
Engineer: Banner Associates, Inc.
Contract Value: $34.1 Million
Contract Completion: September 2025
Delivery Method: Design – Bid – Build