The City of Harrisburg, SD sought out the CMAR process to construct a new facility that would meet increased capacity demands and independently treat their wastewater. PKG was selected as the CMAR in 2017, assisting the engineer in the design development. The project consisted of modifications to an existing lift station, new headworks for screening, an equalization pond for high-flow events, an AeromodTM biological aeration treatment system, UV for disinfection and flow measurement, final aeration, dewatering, and biosolids storage. The city’s staff operates this fully automated facility in an operations building that includes a finished water lift station, blower room, maintenance garage, and fully functional lab. PKG self-performed approximately 65% of the total contract value, including concrete, earthwork, site work, and process equipment. 

Harrisburg 1 scaled

Location: Harrisburg, South Dakota
Project Owner: City of Harrisburg
Engineer: Stockwell Engineers Inc.
Contract Value: $16.3 Million
Contract Completion: September 2021
Delivery Method: Construction Manager at Risk