Project Spotlight

At PKG Contracting, we are proud of our extensive experience in the water and wastewater industry.

Home > Projects > Horizontal Collector Well

Bismarck, ND

Horizontal Collector Well – Phase III Pump House

In 2011, PKG was awarded the third and final phase of intake improvements for the City of Bismarck. The project included construction of an above-grade superstructure, housing a 30MDG pumping system. Project parameters required the building to be susceptible to flooding and ice damage due to its proximity to the river. The building was designed to complement the surrounding river system. The operations floor, designed in the shape of an ellipse, was poured in a single monolithic placement including the concrete haunches. The building is much larger than it appears with a three-story configuration of caisson wet well above the 500-year flood level, pump room, and upper electrical system. 

Location: Bismarck, North Dakota
Project Owner: City of Bismarck, ND
Engineer: AE2S
Contract Value: $4.8 Million
Contract Completion: November 2013
Delivery Method: Design – Bid – Build